Executive Head Office in Lisbon
Interior Design projects for offices defend three main grounds: materiality, innovation and comfort.
Materiality in the conjugation of each element of the space as part individually and as part of the set; innovation, choice and application of the new avant-garde materials, applied following the materiality of each space and improving their use; and comfort, offering opportunities for work and leisure equipped with elements to match your most comfortable occupation. A solid entry announcing the corridor, the backbone of advertising events, featuring the work rooms that follow, as volumes alternate in depth. The special work done around the light and lighting give the space a game of shadows and contrasts that presages the space, thought of as individuals belonging to a single agency, in operation for individual and share a common whole. The choice of comfortable furniture and clean lines, geometric design and revealing their inherent transparence results in an environment of professionalism and thoroughness, punctuated with touches of color.
Portfolio
Executive Head Office in Lisbon
Classification: architecture Status: finalizedJABA-SA
Classification: architecture Status: finalizedJABA SA
Expansion of Production Plant - Abrunheira, Sintra Quality Control - Restructuration of the area, empowering it as regards the production area. CQ Individualization into two zones, for physical and chemical analysis and introduction of a new area for microbiological analysis, providing it with the stringent requirements.
Support Building - Additional support unit incorporating offices, file areas with different degrees of security, registration documents, an auditorium and training rooms as well as a cafeteria, toilets and showers.
Research and Development Unit - Quinta da Cerca, Torres Vedras.
Classification: architecture Status: under constructionIntegrates the areas of R & D Chemist and Galenic, part of the strategic growth area, aiming at the group extension and chain of value on the fabrication of the row materials - active ingredients and tests which allow you to carry the manufacturing processes from laboratory to industrial scale. Its implementation takes the central core of the future campus that the group intends to launch. The original buildings were adapted to meet the development and laboratory analysis needs. The new building was designed to, and according to the strict requirements of an R & D, allow maximum flexibility in internal partitioning. The constructive solution is a metallic structure and its surrounding panels "sandwich" (metal) incorporate the outer spans. The infrastructure circulates through the false ceiling and vertical ducts, distributed throughout the building.